Tricor Design Group logo
Residential Design Services in Calgary
Residential design and drafting · Calgary

Residential Design Services in Calgary

Planning a home project in Calgary? Whether you are a homeowner, a builder, or an investor, Tricor turns your idea into clear drawings the City can actually approve. We have designed Calgary homes since 1985, so we know what works on a real lot and what a reviewer will look for.

Residential Design Custom homes, infills, renovations, additions, and multifamily residential projects.
Permit-Ready Drawings Design and drafting support for development permit and building permit review paths.
Calgary Since 1985 Local project experience informed by Calgary approval and redevelopment realities.

Calgary residential design since 1985

Residential design that considers the site, the rules, and the approval path

A good home design has to do two jobs at once. It has to be the home you want, and it has to fit what your lot and the City of Calgary will allow. That second part is where projects get stuck. Things like setbacks, lot coverage, height, and parking quietly decide what you can actually build. We design around them from day one, so your drawings move through review instead of bouncing back. The earlier we get involved, the more we can save you. A short conversation before the design is locked in often prevents the expensive changes that come up later.

Calgary residential design Permit-ready drawings Zoning-aware layouts Buildable direction

What Tricor helps with

Residential design and drafting services

Concept design

Early direction for layout, massing, and how the home sits on your lot.

Custom home design

New builds designed around your lot and your budget.

Infill and redevelopment

Smart use of inner-city Calgary lots, designed with the neighbourhood and the rules in mind.

Renovations and additions

Clear drawings for changing or adding to an existing home.

Multifamily

Duplexes, semi-detached, row housing, and multifamily.

Development permit drawings

Drawings that explain your project to the City for development permit review.

Building permit drawings

Technical drawings built for the building permit stage.

Site feasibility and bylaw review

An early check of what your lot will allow before you commit.

Approval coordination

e answer City comments and revise drawings so your file keeps moving.

Why approval-aware thinking matters

Good Calgary residential design starts with the rules, not just the floor plan

Most home projects do not stall because of the design. They stall because something about the lot or the bylaw was missed early, and it shows up during City review. We design the other way around. We look at what your site allows first, then shape the home to fit. It is less exciting than jumping straight to floor plans, but it keeps your project on schedule and on budget.

Setbacks Lot coverage Building height Parking Permit comments

The design has to fit the site

Your lot has its own limits, and they shape what is realistic. We check those limits early, so the design we develop is one the City can approve, not one you have to redraw.

The approval path has to be understood early

Tricor helps clients identify approval factors before too much time is spent in the wrong direction, creating residential design and drafting work that is practical, coordinated, and ready for the permit path.

Tricor process

From early residential questions to permit-ready drawings

A better residential design process does not start with drawings alone. It starts with understanding the site, Calgary zoning rules, project goals, buildability, approval expectations, and the documentation needed to move the project forward with fewer surprises.

Residential design roadmap Six steps that connect design direction with approval readiness
[ PERMIT-READY PATH ]
01
Project discovery

Clarify goals and site

We start with your goals, your property, and your timeline, so the design has a clear brief.

02
Site review

Check zoning and constraints

We review what your lot allows before decisions get expensive to undo.

03
Design direction

Shape a buildable concept

We develop a direction that fits your goals, your site, and Calgary's rules.

04
Drawing development

Prepare coordinated drawings

We turn the concept into clear drawings for review, pricing, or the next stage.

05
Permit readiness

Develop permit drawings

We take the drawings to the development permit or building permit level your project needs.

06
Submission support

Respond to review comments

We handle City questions and revisions so your file keeps moving.

Residential project types

Design and drafting support across Calgary residential projects

Tricor Design Group supports a range of residential design and drafting needs in Calgary, from custom homes and inner-city infills to duplexes, row housing, renovations, additions, and investor-led redevelopment projects.

Tell us about your lot and what you want to build. We will tell you honestly what is possible and what the approval path looks like.

Residential design FAQ

Questions about residential design in Calgary

These questions help homeowners, builders, property owners, and investors understand how Tricor approaches Calgary residential design, drafting, permits, infill planning, renovations, additions, and approval-ready documentation.

What does residential design include?

The planning and drawings that get a home ready for permits and construction. That usually means site planning, floor plans, elevations, massing, and the drafting behind them. For a renovation or infill, it also covers how the changes fit the existing home and the lot.

Does Tricor provide residential design and drafting in Calgary?

Yes. We handle most Calgary homes: custom builds, inner-city infills, renovations and additions, duplexes and semi-detached homes, row housing, small multifamily, and investor redevelopment.

When should I contact Tricor about a residential project?

As early as you can, ideally before the design is final or a permit is submitted. An early look can catch lot or bylaw issues while they are still cheap to fix.

Can Tricor help with development permit or building permit drawings?

Yes. We prepare both, and we match the drawings to the stage your project is at and the review it needs.

Can Tricor help with infill design and redevelopment sites?

Yes. Inner-city lots come with their own rules and neighbour context. We design infill and redevelopment that respects both and is realistic to approve.

What information should I prepare before contacting Tricor?

Whatever you have: the address, what you want to build, a rough budget or timeline, and any property documents. Even a little helps us point you the right way.